1.北京郭公庄自来水厂

    一期投资35亿人民币,占地17万平方米,是南水北调重要工程,供水能力50万m³/日,未来达到100万m³/日。是国内工艺链最完整、技术最先进的自来水厂之一。负责滤池成套设备采购及服务,自动化监控系统、综合布线系统、工业监控系统、信息系统、显示系统、各种在线检测仪表及水质系统、安防系统及软件、有关设备连接通讯软件和系统集成的采购供货、安装、调试、投运和维护等工作内容。

1.Guogongzhuang Waterworks, Beijing.

The phase one of investment of 3.5 billion CNY, covering an area of 170,000 square meters, is an important project in the South-to-North Water Diversion, water supply capacity of 500,000 m³ / day, the future reached 1 million m³ / day. Is the domestic process chain of the most complete, the most technologically advanced water works. Responsible for the procurement and service of filter system complete sets of equipment, automated monitoring system, integrated wiring system, industrial monitoring system, information system, display system, various online detection instruments and water quality systems, security systems and software, related equipment connected communication software and system integration procurement and supply, installation, commissioning, delivery and maintenance of the procurement and supply.

    

2.北京黄村自来水厂

项目为南水北调配套工程,总面积约34公顷,负责大兴新城地区的供水任务。负责滤池成套设备采购及服务、自动化监控系统、综合布线系统、工业监控系统、信息系统、显示系统、各种在线检测仪表及水质系统、安防系统及软件、有关设备连接通讯软件和系统集成的采购供货、安装、调试、投运和维护等工作内容。

2. Huangcun Waterworks, Beijing.

The project is a supporting project for the South-to-North Water Diversion, with a total area of about 34 hectares, responsible for the water supply task in Da Xing District Xincheng area. Responsible for the procurement and service of Media Filtration complete sets of equipment, automatic monitoring system, integrated wiring system, industrial monitoring system, information system, display system, various online detection instruments and water quality systems, security systems and software, related equipment connected communication software and system integration procurement and supply, installation, commissioning, delivery and maintenance of the procurement and supply.

    

3.成都自来水七厂

工程设计规模50万m³(一期),总用地450亩,总投资20亿人民币,是全国为数不多的一次性建成50万m³/日的自来水厂之一,项目从开工到竣工验收通水仅用320天,这在全国也是绝无仅有的。负责全厂自控及仪表设备的采购与安装、厂区总平施工、机电设备及管线的安装、调试等。

3. Chengdu Water Seven Waterworks.

Engineering design capacity of 500,000 m³, a total land of 300000 m2, a total investment of 2 billion CNY, is one of the few one-time construction of 500,000 m³ / day of automatic Waterworks, the project from start to completion acceptance of water only 320 days, which is also a unique project in China. Responsible for the whole Factory control and instrumentation equipment procurement and installation, Factory general level construction, mechanical and electrical equipment and pipeline installation, commissioning and etc.

      

4.江苏盐城盐龙湖自来水厂

江苏盐城盐龙湖自来水厂一期工程,设计净水30万m³/日。负责全厂工艺、电气、自控设备安装及全部安装辅材的供货、系统的安装、调试、开通、性能检验、验收配合、技术文件提供、工程保修、总平面管道安装,验收配合及工程保修等服务。

4. Yanlonghu WaterWorks in Yancheng, Jiangsu Province.

Yancheng, Jiangsu Yanlonghu Waterworks Phase One Project, designed water purification of 300,000 m³/day. Responsible for the whole factory process, electrical, automatic control system equipment installation and all installation of auxiliary materials supply, system installation, commissioning, debugging, performance inspection, acceptance, technical documents provided, warranty, total plane pipeline installation, acceptance and warranty and etc.

    

5.上海市金山一自来水厂

二期工程20万m³/日,净自来水厂及取水泵站的工艺流程与已建的一期工艺流程相对独立。负责净自来水厂深度处理工艺、电气和仪表设备的设计配合、部分安装设备及全部安装铺材的供货、系统的安装、调试、开通、性能检验、验收配合、技术文件提供、工程保修等服务。

5. A WaterWorks in Jinshan, Shanghai.

The phase two of the project 200,000 m³ / day, the process of the water works factory and the water pump station are isolation than the phase one’s. Responsible for the deep treatment process of the water works, electrical and instrumentation equipment design cooperation, part of the installation equipment and all the installation of paving supply, system installation, commissioning, debugging, performance inspection, acceptance cooperation, technical documents provided, engineering warranty and etc.


6.上海市崇明区城桥自来水厂

项目每日净水7.5万m³/日,服务总人口二十余万人,以满足城桥镇、建设镇、港西镇、新河镇等崇明中部地区日益增长的用水需求。负责厂区构筑物内工艺设备、电气设备、自控与仪表设备的供货及安装调试、验收,人员培训等。

6.Chongming District Chengqiao Waterworks, Shanghai.

Project daily water purification 75,000 m³ / day, serving more than 200,000 people to meet the Chengqiao town, Jianshe town, Gangxi town, Xinhe town and other Chongming central area of the growing demand for water. Responsible for the factory structure process equipment, electrical equipment, automatic control and instrumentation equipment supply and installation and commissioning, acceptance, personnel training.

   


7.上海市青浦第二自来水厂

青浦第二自来水厂占地面积100.7 亩,总设计规模为40万m³/日,总投资约2.6亿人民币。负责机电设备总承包,包括工艺设备、电气设备、仪表及自控系统设备、自控系统软件开发、工艺管道、电缆等所有设备及材料的供货与安装调试。

7. Qingpu District Second Waterworks, Shanghai.

Qingpu District Second Waterworks covers an area of 67200 m2, with a total design 400,000 m³/day, with a total investment of about 260 million CNY. Responsible for the general contracting of mechanical and electrical equipment, including process equipment, electrical equipment, instrumentation and control system equipment, automatic control system software development, process pipeline, cable and other equipment and materials supply and installation and commissioning.

    

8.上海市崇明区堡镇自来水厂

负责全厂工艺、电气和自控系统设计配合、设备及材料供货、系统安装、调试、开通、检验、验收、技术文件提供、人员培训、工程保修等服务。

8. Chongming District Fort Town Waterworks, Shanghai.

Responsible for the factory-wide process, electrical and automatic control system design and cooperation, equipment and materials supply, system installation, commissioning, debugging, inspection, acceptance, technical documents, personnel training, engineering warranty and etc.

    

9.杭州市自来水公司九溪自来水厂

项目设计净水能力60万m³/日,覆盖城西、城中、丁桥、之江、老余杭等120万人口,为杭州市民提供优质的生活用水。负责全厂加氯、加药系统,沉淀池系统,滤池系统,泵站系统,高低压配电系统设备安装,厂区管道安装及全厂自动化系统安装和调试,厂区平面灯光系统和办公区空调系统安调。

9. Hangzhou Water Company Jiuxi Water Works.

The project design water purification capacity of 600,000 m³/day, covering the Chengxi, Chengzhong, Dingqiao, Zhijiang, Lao Yuhang coverage about 1.2 million people, for the people of Hangzhou to provide quality water for life. Responsible for the factory chlorine, dosing system, sedimentation tank system, filter system, pumping station system, high and low voltage distribution system equipment installation, factory pipeline installation and factory automation system installation and commissioning, factory plane lighting system and office area air conditioning system.

    

10.福建厦门市自来水总公司高殿自来水厂

项目最大供水能力90万m³/日,是福建全省最大的自来水厂,承担着厦门岛内90%以上的供水任务,覆盖200多万人口。信高负责了全厂软硬件的系统配置、相关系统设备及材料选购、自动化控制系统改造、通讯系统安装、系统施工安装、软件编程、系统调试、人员培训和保修服务。

10.Xiamen City Water Corporation Gao temple Waterworks, Fujian.

The project's maximum water supply capacity of 900,000 m³/day is the largest Waterworks in Fujian Province, which is responsible for more than 90% of the Xiamen island's water supply, covering more than 2 million people. Responsible for the system configuration of the whole factory hardware and software, related system equipment and materials purchase, automation control system upgrade, communication system installation, system construction installation, software programming, system commissioning, training and warranty.